This project was designed to increase the processing capacity of the Lowe Corporation Blue Cattle Hide Tannery on Coventry Road, Hastings. This included the large concrete foundations & plinth construction in order to support the new imported processing drums. The large concrete plinths stand 3m high and required extensive insitu formwork support before being poured.
It also included the large extension to the current building which houses all the drums along with a concrete yard slab area for truck movements. The building consisted of Precast concrete, structural steel and Webglass roofing & cladding. The buildings apex is 13.5m above the ground.